Hose Lifters
ISS Manufacturing process
At ISS we offer a high degree of flexibility to our manufacturing process to align with client needs while sticking to industry leading manufacturing standards and testing processes. ISS can provide assistance with drawings and alterations to the final design.
Providing samples
We offer as samples for customers as full working items.
we offer samples as per design supplied or to customers hose specifications.
Customer Onsite Testing period
Customer is given to opportunity to do onsite testing/swaging with the samples provided and request design changes accordingly prior to production or ready for next onsite test.
Production
Our full production process includes CNC Programming, Proving, inspection and quality testing. Initial order to point of delivery can be as little as 14 days.
Manufacturing standards
ISS provides lift load testing of up to a proof load of 16 tons to provide safe work load of up to 8 tons. The testing is carried out in accordance with Lifting Operations and Lifting Equipment Regulations 1998
The hose lifters are all stamped with iss logo, ce marked and an individual lift test stamp in conjunction with lift load test certificate
Machinery
The machinery used for load testing is calibrated to give consistent and accurate, reliable test results.
Hose Lifters Videos
Videos
Stress testing hose a lifter